Light Box

Light Box


Negotiable Min Order Quantity Unit

Required Quantity
Place of Origin
Payment Terms
Negotiable
Production method
Negotiable
Shipping / Lead Time
Negotiable / Negotiable
Keyword
Category
Other Minerals & Metallurgy Products
tK Meet
tK Meet

Apply a video call to the Supplier

SEND TO SUPPLIER INQUIRY

Aerotech Korea Co., Ltd.

Country / Year Established
South Korea South Korea /
Business type
Others
Verified Certificate

16

DUNS

Product name Light Box Certification -
Category Other Minerals & Metallurgy Products Ingredients -
Keyword - Unit Size -
Brand name - Unit Weigh -
origin Stock -
Supply type - HS code -

Product Information

The SBH Light Box combines the light plate construction and the flexible spindle. This makes this type of shoring so perfect for small to medium trench shoring and the use of light construction machinery.
This shoring can be used in not stable ground conditions, too.
The flexible spindle is suited for the installation with cut and lower method.

The light box is mostly used for supply lines, house connections and able laying.

The robust construction of the side profiles allows higher strut clearances compared to the light weight shoring and the spindle we use with this type of shoring allows greater trench widths.

Installation depth up to : 4.00m
Trench with : 1.10 - 4.39m
Spindle clearance height : 1.30m

Specificatioin

Year
Client
Construction CO.
Project Name
2006
Andong-si CheongLim Inc. Co.
Bosung Construction Co.
AnDong-Si Sewer Pipe Maintenance Works
Korean Electronic Power
Corporation
KangNung Construction Co. Busan Electronic Power Transmission Cable Laying Work
Daegu-si
HanKuk Development Co. DaeJang village Sewer Pipe Maintenance Works
Yeoju-si YuJin Construction Co. YeoJu MyungSeung Construction Site
Environmental Management Corporation
(E.M.C)
Daewoo Construction Co. Han-River Water System Sewer Pipe
Maintenance Works : 5nd Section(YongIn)
  GS Construction Co. Han-River Water System Sewer Pipe
Maintenance Works:
2nd Section(Nam Yang Ju)
Busan-si Lotte Construction Co. GiJang Sewage Disposal Plant Pipe Works
TongYoung-su DaeJeo Construction Co. TongYoung-Si Sewer Pipe Maintenance Works : 1st Step.
2005 Environmental
Management
Corporation
(E.M.C)
GS Construction Co. Han-River Water System Sewer Pipe
Maintenance Works: 2nd Section(NamYangJu)
Kolon Construction Co. Han-River Water System Sewer Pipe
Maintenance Works: 3nd Section(Gapyeong)
Samsung Engineering Co. Han-River Water System Sewer Pipe
Maintenance Works: 4nd Section
(YeoJu,YangPyeong)
Daewoo Construction Co. Han-River Water System Sewer Pipe
Maintenance Works: 5nd Section
(GonJiAm / GwangJu / YongIn)
Korea Development Co. Han-River Water System Sewer Pipe
Maintenance Works: 6nd Section(HaNam)
2004 Environmental
Management
Corporation
(E.M.C)
GS Construction Co. Han-River Water System Sewer Pipe
Maintenance Works: 2nd Section(NamYangJu)
Kolon Construction Co. Han-River Water System Sewer Pipe
Maintenance Works: 3rd Section(Gapyeong)
Samsung Engineering Co. Han-River Water System Sewer Pipe
Maintenance Works: 4th Section
(YeoJu / YangPyeong)
Daewoo Construction Co. Han-River Water System Sewer Pipe
Maintenance Works: 5th Section
(GonJiAm / GwangJu / YongIn)
Korea Development Co. Han-River Water System Sewer Pipe
Maintenance Works: 6th Section(HaNam)

B2B Trade

Price (FOB) Negotiable transportation -
MOQ Negotiable Leadtime Negotiable
Payment Options Negotiable Shipping time Negotiable

Aerotech Korea Co., Ltd.

Country / Year Established
South Korea South Korea /
Business type
Others

16

DUNS

President
JI SUNG WHAN
Address
6thFl., Hanshin IT TowerII, Gasan-dong, Geumcheon-gu, Seoul, Korea
Product Category
Hand Tools,Other Minerals & Metallurgy Products
No. of Total Employees
1-50
Company introduction

Putting the top priority to safety and environment based on "the spirit of respecting human being" at the construction site of each area, Korea Aero Tech intends to lead the innovation of construction culture in all sectors such as developing, designing, producing, leasing, selling and constructing all products.
 
Especially, in the area of provisional facilities for blocking soil in the underground excavation work for underground pipe and underground structure, we save the budget of customer and each constructor by perfect safety control and prompt processing control through our products and construction method so that they can create maximum profit. Further, we satisfy our customers by constructing competitive products with excellent quality in defense facilities of rock crush and other safety facilities which use steel liner plate in the area of road facilities.

We promise that we will realize brilliant growth through incessant challenge toward world with ceaseless R&D as well as domestically/globally competitive products and unlimited total service spirit.

Main Product

Related Products

Other buyers also search

Membership Grade

BUYER

Biz Pro VIP

SELLER

Biz Pro VIP
팝업닫기
Live Chat A new message arrives
from a business partner.

No Data

  • There is no data to load
  • Check out the My tK > My Inquiries list.
  • After agreeing to the use of the Live Chat service, the list is printed only when there is at least one history of receiving or sending a Live Chat request.

If you have not yet agreed to use the Live Chat service,

You can use the Live Chat freely after agreeing to the use of the Live Chat service.

View more
View more