PIPE PAINTING PLANT


Negotiable Min Order Quantity Unit

Required Quantity
Place of Origin
South Korea
Brand name
NAWOO PAINTING PLANT
Payment Terms
Negotiable
Production method
Negotiable
Shipping / Lead Time
Negotiable / Negotiable
Keyword
coating machine, painting plant, fitting machinery, pipe fitting machine
Category
Pipe Fittings , Metal Coating Machinery , Other Environmental Products
tK Meet
tK Meet

Apply a video call to the Supplier

SEND TO SUPPLIER INQUIRY

NAWOO PAINTING PLANT

Membership
VIP
Country / Year Established
South Korea South Korea /
Business type
Manufacturer
Verified Certificate

11

TRADE TOWER

DUNS

Product name PIPE PAINTING PLANT Certification -
Category Pipe Fittings
Metal Coating Machinery
Other Environmental Products
Ingredients -
Keyword coating machine , painting plant , fitting machinery , pipe fitting machine Unit Size -
Brand name NAWOO PAINTING PLANT Unit Weigh -
origin South Korea Stock -
Supply type - HS code 8514409000

Product Information

PIPE COATING PLANT

This plant was developed as new technique to provide against future request and need for coating on Pipe and C-shape steel.

1.The reason why steel manufacture set up this plant.

  • To proof against rust and corrosion on surface of product during delivery after production.
  • To solve problem which is caused during 1st base coating. A lot of still pipe manufacturers have been installing this plant.
2-1. the local distributor secure many kinds of product and deal it.  
  • Deliver goods from steel pipe manufacturer.
    There is possibility to induce a flaw on product surface during transportation and by climatic influence ( rain, snow and frost etc..)
  • Long-term stock
    Because a distributor can not prevent rust or corrosion that is occurred on surface of product. When keep long-term, an inventory should be disposed for its scrap value. So the 1st base coating is required.

 

2-2. A requirement of customer
Because the first user who make new product with original pipe has to coat the surface, the  pipe is exposed in the air.

In case of this process

  • The company can be pronounced fine or detention by environmental law violation through mistake that pollute air.
  • Worker lose his health by influence of poisonous ingredient that is contained in paint.
  • Among general coating method,

 

a) with Bush or Roller

  • Because coating film is thick, a consumption of paint and cost for coating are increased.
  • The floor is contaminated
  • working time is long
  • personnel expense is increased

b) Spray coating with air

The paint dispersed in the air,

  • polluter the circumstance ( a spouted paint spread about 400m )
  • even though a lot of quantity of paint was sprayed, it is about 15% that is coated on the surface of pipe, so it is also economical loss.
  • worker can suffer damage to hazardous object. So the customer prefer to buy the pipe with 1st surface treatment for their economical.

 

Our plant’s advantage corresponds with management philosophy of steel manufacturer.

  1. High performance
  2. Economical efficiency
  3. Saving of resources
  4. Saving of energy
  5. Reduce the pollution of air and water
  6. Maintenance of performance for long time
  7. Improvement of working circumstance

The pipe coating plant which has above several merits have been supplying to domestic companies from  5 ~ 6 years ago.

In case of the company in developing country, they started to use this plant from 2004.

Sales Merit

Nowadays the pipe sales distributor and customer wants to get 1st coated pipe. And, as for manufacturer, they can sell the product with high quality and attractive price.

If you do not have it, your agent may handle another supplier’s product.

In korea, about 30 ~ 40% of steel pipe manufacturer already installed it. And a lot of importer of steel pipe from china also got it.

 

[ Equipment comparative table ]

Difference of equipment possession and non- possession

When you have the plant, you can take the above advantage.

 Specially, you can prevent sliding accident which can be happen at general rust preventing and have productivity elevation because long-term storage is available in pipe management.

Because the product with 1st coating is easy to use and convenient to store, the consumption will be increased.

 

[ Pipe plant cost ]

  • plant amount : about \500,000,000.- (generally)
  • Loaning interest for industrial investment : about 4%
    ( local autonomy fund : about 3.5%)
  • interest for \500,000,000.- for 1 year  : \48,000,000.-/year
  • profit / cost : about 30%
  • production 12,000 ton/year : \960,000,000.- x 30% = \288,000,000.
  • created profit
  • \288,000,000 - \48,000,000 (interest) = \24,000,000.-

 

[ Planning for Pipe coating plant ]

This equipment will be designed and manufactured specially in elevation of reliability, stability and maintainability. We will try more and more for development of better installment. We appreciate your examination and advice about our plant.

 

[ Application ]

This plant is applied to your product like pipe, C-shape steel painting and transfer equipment.

Object
This plant is manufactured and installed for continuous working process of conveyor system of Pipe, C-shape steel cleaning, coating and drying.

You can get energy curtailment effect by operating this plant with preventing paint loss and heat loss that happen during coating.

Therefore, this plant make increase customer's purchase amount and enlarge production capacity by improvement of working environment, cost reduct and elevation of quality.

 

[ Configuration of Plant ]

This plant is designed and installed to achieve preceding descriptions purpose with named “SPRAY PAINTING LINE FOR PIPE”.

INLET CONVEYOR

  • INLET CHAIN CONVEYOR
  • NLET LIFTER POCKET
  • FEEDING CHAIN CONVEYOR
  • WALKING & KICKER

 

[ Estimation and problem solution of pipe coating plant ]

It was designed to come forward in succession with washing and coating a round (or square) pipe that become charging consecutively by Roll conveyor.

There are problems in manufacture, transportation and installation because the structure of this system is complex.

Pretreatment à Washing ( cleaning ( with milling oil) : 5 ~ 10 sec., air blowder : 5 ~ 10 sec.)Moisture dry oven & coating dry oven  à M.F Heater.

We lowered equipment price greatly by method such as upside. ( usual line : \3,000,000,000 ~ 4,000,000,000.-  , Developed plant : \500,000,000.-)

Environmental problem about wastewater and air pollution
We reduced displacement from coating booth by lower than acceptable level to solve problem about wastewater and air pollution. And we install the paint-withdrawal device to solve wastewater and air pollution problem. This solves environmental problem and reduced burden of environmental problem in future equipment planning.

Cost reduction of Paint

A) comparison of Paint cost reduction according to coating method

  1. Brush coating
    Coating that do by brush is convenient to coat big product freely and it is advantage that unnecessary consumption of coating material does not exist. But, it is not suitable to a pipe for mass production.
  2. Air-spray coating
    It is easy to handle the air-spray coating and widely used because various shape and size can be coated and fine view is superior. But a paint is dispersed too much and coating efficiency is low. And the cost of equipment for mass production is expensive.
    So it make environment problem with dispersed paint. The consumption of paint is increased.
  3. Air-less spray coating
    This is the method which meet your need. The liquid in commonness and High-viscosity are atomized efficiently and the particle is thin relatively and uniform.
    Because air-less spray do not use air to be atomized, work-efficiency is high and waste of paint is decreased much.
  4. Electrical coloring
    There are two ways to do color-coating by electric method, electrostatic coating. In this method,
    - coating thicknesses equal
    - surface gloss is excellent
    - coating is available by discharge of small quantity.
    But this is used for small product and the price of equipment is very expensive.

 

B) Cost reduction with equipment
We got a patent of this plant which was developed for paint cost reduction and protecting environment. In current coating plant, the A/C tower is equipped behind paint boot. But, because a dispersed paint is radiated without filtering from paint booth, A/C tower can not prevent the air pollution and more than 70% of paint is wasted. So we developed the paint recycling system which can take 90% of paint from waste paint and save the paint cost.

 

B2B Trade

Price (FOB) Negotiable transportation -
MOQ Negotiable Leadtime Negotiable
Payment Options Negotiable Shipping time Negotiable

NAWOO PAINTING PLANT

Country / Year Established
South Korea South Korea /
Membership
VIP
Business type
Manufacturer

11

TRADE TOWER

DUNS

President
duck chul,Lee
Address
214ho,6-dong, 81-44, Jeongwang-Dong,Siheung-si,Gyeonggi-Do,Korea
Product Category
Car Care Equipment,Metal Coating Machinery,Washing Machines
No. of Total Employees
1-50
Company introduction
We specialize in painting equipment machine comprising more than 90% of our products lineup and mainly produce painting equipment, industrial equipment and automation equipment.

While we have manufactured the products concerning the painting equipment and the likes over the past 10 years since foundation in June of 2002, we have obtained lots of advanced technologies and achieved localization of our own developed core equipment and as a result we got effect of importing substitutive.  All of us have used every effort placing the advancement of quality at top priority with the exhaustive view of nation and extraordinary values with  respect to the quality assurance.

 With this endless efforts and development, we will not flatter ourselves and  to meet the expectations of customers but we will use continuing efforts to create “Tip top most company leading 21C” by more active and prospective instead of the management settling for the present with newer attitudes of mind.

In addition, we will try our utmost efforts to build an advanced company which can grasp what are needed by customers and provide services to them instead of the management just  awaiting customer through the best quality product and the best service under the management motto of customer satisfaction.


1) We have three Certificate of a partent. It's demonstrative of our skill

. 1. PIPE COATING CHAMBER 2. MOVING MACHINE OF PIPE 3. DRY MACHINE OF PIPE

2)05, DEC , 2012 . we received One Million dollars export prize from: President of south Korea Myung-Bak,Lee

3)18,DEC, 2012 we received " Promising Export Firm" by the small&medium business administraion. This is certificate that we are growing into exporter Issue date : 2012.12.18 ~ expiry date : 2014. 12.17

4) SO 14001 : Environment of management system We got a patent of this plant which was developed for paint cost reduction and protecting environment.
In current coating plant, the A/C tower is equipped behind paint boot.

But, because a dispersed paint is radiated without filtering from paint booth, A/C tower can not prevent the air pollution and more than 70% of paint is wasted.

So we developed the paint recycling system which can take 90% of paint from waste paint and save the paint cost.

Main Markets

South Korea South Korea

Thailand Thailand

Turkey Turkey

Factory Information

NAWOO PAINTING PLANT

Main Product

Related Products

Other buyers also search

Membership Grade

BUYER

Biz Pro VIP

SELLER

Biz Pro VIP
팝업닫기
Live Chat A new message arrives
from a business partner.

No Data

  • There is no data to load
  • Check out the My tK > My Inquiries list.
  • After agreeing to the use of the Live Chat service, the list is printed only when there is at least one history of receiving or sending a Live Chat request.

If you have not yet agreed to use the Live Chat service,

You can use the Live Chat freely after agreeing to the use of the Live Chat service.

View more
View more