-
- South Korea / 1990
3 Way - Over Pressure Protection integrated - Alarm Valve
- ◾ Price: Negotiable
- ◾ MOQ: Negotiable
3 Way - Over Pressure Protection integrated - Alarm Valve
- ◾ Price: Negotiable
- ◾ MOQ: Negotiable
-
TKG AIKANG's 3 Way - Over Pressure Protection integrated - Alarm Valve
-
Required Quantity
-
Brand name
-
Shipping / Lead TimeNegotiable / Negotiable
-
Keyword
-
Category
Specifications
| Size | - | Weight | - | Stock | 1,000 Pieces |
|---|---|---|---|---|---|
| Country of Origin | South Korea | ||||
| Production method | Available, OBM, ODM, OEM | ||||
Trade Terms
| Payment Terms | D/A, D/P, L/C, MoneyGram, Others, T/T, Western Union | ||||
|---|---|---|---|---|---|
| Price(FOB) | Negotiable | MOQ | Negotiable | ||
| Transportation | Air Transportation, Express, Land Transportation, Negotiation Other, Ocean Shipping | ||||
| Lead time | Negotiable | Shipping time | Negotiable | ||
Company
-
Country / Year Established
-
Membership
- VIP
Business typeManufacturer
-
Verified Certificate
-
18
-
18
-
Main Export Markets
-
India
-
Japan
-
Mongolia
-
Russia
-
South Korea
-
Product Description

3 Way - Over Pressure Protection integrated - Alarm Valve
(New Integrated Pressure Relief Valve with Butterfly-type Alarm Valve)
Comparation Between the existing and New Version
1. Product's Appearance

The existing The New
2. Advantage
The pressure relief valve is an essential component when installing an alarm check valve.
With the existing pressure relief valve, it must be installed after the alarm valve has been installed and after passing the hydrostatic pressure test.
However, the new pressure relief valve can be installed simultaneously with the alarm valve, reducing the overall work process.
Furthermore, the new pressure relief valve allows for replacement without the need for draining or refilling the system, enabling the valve to be replaced directly.
3. Expected Benefits
- Reduction in labor costs
- Reduction in work time
- Convenience for post-maintenance
4. How to use







