Packer

Packer


Negotiable Min Order Quantity Unit

Required Quantity
Place of Origin
Payment Terms
Negotiable
Production method
Negotiable
Shipping / Lead Time
Negotiable / Negotiable
Keyword
Category
Pumps
tK Meet
tK Meet

Apply a video call to the Supplier

SEND TO SUPPLIER INQUIRY

Samwon Tuksu Co., Ltd.

Country / Year Established
South Korea South Korea /
Business type
Others
Verified Certificate

16

DUNS

Product name Packer Certification -
Category Pumps Ingredients -
Keyword - Unit Size -
Brand name - Unit Weigh -
origin Stock -
Supply type - HS code -

Product Information

Packer

Overview

Patented construction method preventing water-tight layer form destruction mainly because of cracks or its swelling/coming off as expansion matters such as moisture generated form layers under the water-tight layer, which is exposed and directly affected by temperature are emitted.

A Method of Construction for Injection

1. Crack and leakage condition inspection

Check the process procedure after finding the thickness, width and depth of crack and leakage condition of the structure

2. Drilling Operation

Drill directly into crack section if the thickness of concrete is thinner than 10cm. For the thickness of 10cm ~ 50cm, drill it with 45 degree angle by keeping a distance of 1/5 of concrete thickness. Make sure it penetrates the crack section. If the thickness is over than 50cm, keep the distance of 20cm ~ 30cm and drill it with 45 degree angle until it penetrates crack section. And keep drilling by maintaining the fixed interval. (5 holes per 1 meter. Drill it in zigzags)

3. Packer Installation

Clean the inside of drilled holes with compressor. Make sure that rubber sleeve of packer and cutting line of tightening nut should be put into the inside of concrete surface when installing. Tighten the packer completely by using the T-box. (Packer might be damaged if you tighten it too strongly)

4. Injection Operation

Inject the urethane water stopping material by using the high pressure device or grease gun. Maintain the initial injection pressure as around 40kg/cm and increase the pressure by each 10kg/cm gradually until the water stopping material flows out from crack section. Water will come out from the crack section first and then water stopping foaming agent and then water stopping liquid at last. If the water stopping material that is not foamed comes from the crack section, then move to next packer for injection.

5. Packer Removing Operation

Remove and break the packer by using vise pliers or hammer as a tool. If there is still a wet section, then inject the water stopping material again.

6. Finishing Operation

Remove the water stopping material that is remained on the crack section. Spreading with the elastic sealing material.

 

B2B Trade

Price (FOB) Negotiable transportation -
MOQ Negotiable Leadtime Negotiable
Payment Options Negotiable Shipping time Negotiable

Samwon Tuksu Co., Ltd.

Country / Year Established
South Korea South Korea /
Business type
Others

16

DUNS

President
Dongil Kim
Address
440-4 Sangdae-dong, Yuseong-gu, Daejeon, Korea
Product Category
Pumps
No. of Total Employees
1-50
Company introduction

Samwon Company has been devoted to water leakage, repair and reinforcement of concrete constructions since 1990. We have undertaken our constructions under the principle that we must be the best at repairing all defects from cleaves, water leakages of constructions 40m underwater to buildings, engineering works, installing of equipment. We have also been on observation tours abroad to study repair and reinforcement of constructions all over the world.
 
We will repay for your precious encouragement through experienced constructions and careful selection of materials.

We are planning overseas expansion supported by our accumulated experience and know-how. We are aware that all of our achievements have been possible only through our customers' encouragement, which we will repay for by securing reliability in all our constructions.

Main Markets

Malaysia Malaysia

Taiwan Taiwan

Main Product

Related Products

Other buyers also search

Membership Grade

BUYER

Biz Pro VIP

SELLER

Biz Pro VIP
팝업닫기
Live Chat A new message arrives
from a business partner.

No Data

  • There is no data to load
  • Check out the My tK > My Inquiries list.
  • After agreeing to the use of the Live Chat service, the list is printed only when there is at least one history of receiving or sending a Live Chat request.

If you have not yet agreed to use the Live Chat service,

You can use the Live Chat freely after agreeing to the use of the Live Chat service.

View more
View more