Injection Pump Single Line (SWM-1000)

Injection Pump Single Line (SWM-1000)


Negotiable Min Order Quantity Unit

Required Quantity
Place of Origin
Payment Terms
Negotiable
Production method
Negotiable
Shipping / Lead Time
Negotiable / Negotiable
Keyword
Category
Pumps
tK Meet
tK Meet

Apply a video call to the Supplier

SEND TO SUPPLIER INQUIRY

Samwon Tuksu Co., Ltd.

Country / Year Established
South Korea South Korea /
Business type
Others
Verified Certificate

16

DUNS

Product name Injection Pump Single Line (SWM-1000) Certification -
Category Pumps Ingredients -
Keyword - Unit Size -
Brand name - Unit Weigh -
origin Stock -
Supply type - HS code -

Product Information

Injection Pump Single Line (SWM-1000)

Feature

  • Simple operation
  • Owing to small and light weight, it is easy to move and work in small place.
  • It is easy to exchange expendables and cheap for maintenance and management
  • After use, it is easy to wash

Specification

  • Weight : 8kg
  • Maximum plasmoptysis pressure : 500kg/cm2
  • Second plasmoptysis pressure : 350kg/cm2 under
  • High pressure safe scope : <700kg/cm2
  • Power voltage : AC220V, 60Hz

Urethane Foam Grout Instructions

No.
Image
Use.
01
Drill
Use a twist drill (10Ø) to drill holes at an interval of less than 20cm. At a depth of 6~10cm, drill at a 45 degree ngle along the side of the crack.
02
Insert Packer
Remove dust from the drilled holes and insert packers. Leave about 2cm from the injection site to easily remove packers at the end.
03
Tighten Packer
Use a T handle (10Ø) to tighten packers to firmly position the packers and to prevent the grout from leaking.
04
Urethane Foam Grout
Fill two-thirds of the injection pump with urethane foam grout and close the lid.
05
Begin Injection
Begin injection- Since the packers are installed at intervals less than 20cm, begin from one end to the other. Move from bottom to top for vertical cracks and from end points to the middle for horizontal cracks.
06
When Injecting
When injecting, start with a low pressure and inject until 10cm leaks out from both sides of the packer. Do not inject too much at once and insert the next packer before more injections.
07
Remove Packer
Use a hammer to hit the injection site of the packer to separate it from the wall. Since the packer is able to prevent reverse current flow, the urethane grout in the cracks will not leak out even with the removed packer
08
Cleaning
Use a urethane thinner followed by cleaning oil if you do not plan to use it again for a long time. Use only cleaning oil if you will be using it within a few days. Fill one-third of the injection pump for cleaning. You may use engine oil instead of cleaning oil.

 

B2B Trade

Price (FOB) Negotiable transportation -
MOQ Negotiable Leadtime Negotiable
Payment Options Negotiable Shipping time Negotiable

Samwon Tuksu Co., Ltd.

Country / Year Established
South Korea South Korea /
Business type
Others

16

DUNS

President
Dongil Kim
Address
440-4 Sangdae-dong, Yuseong-gu, Daejeon, Korea
Product Category
Pumps
No. of Total Employees
1-50
Company introduction

Samwon Company has been devoted to water leakage, repair and reinforcement of concrete constructions since 1990. We have undertaken our constructions under the principle that we must be the best at repairing all defects from cleaves, water leakages of constructions 40m underwater to buildings, engineering works, installing of equipment. We have also been on observation tours abroad to study repair and reinforcement of constructions all over the world.
 
We will repay for your precious encouragement through experienced constructions and careful selection of materials.

We are planning overseas expansion supported by our accumulated experience and know-how. We are aware that all of our achievements have been possible only through our customers' encouragement, which we will repay for by securing reliability in all our constructions.

Main Markets

Malaysia Malaysia

Taiwan Taiwan

Main Product

Related Products

Other buyers also search

Membership Grade

BUYER

Biz Pro VIP

SELLER

Biz Pro VIP
팝업닫기
Live Chat A new message arrives
from a business partner.

No Data

  • There is no data to load
  • Check out the My tK > My Inquiries list.
  • After agreeing to the use of the Live Chat service, the list is printed only when there is at least one history of receiving or sending a Live Chat request.

If you have not yet agreed to use the Live Chat service,

You can use the Live Chat freely after agreeing to the use of the Live Chat service.

View more
View more